📢 Gate Square Exclusive: #PUBLIC Creative Contest# Is Now Live!
Join Gate Launchpool Round 297 — PublicAI (PUBLIC) and share your post on Gate Square for a chance to win from a 4,000 $PUBLIC prize pool
🎨 Event Period
Aug 18, 2025, 10:00 – Aug 22, 2025, 16:00 (UTC)
📌 How to Participate
Post original content on Gate Square related to PublicAI (PUBLIC) or the ongoing Launchpool event
Content must be at least 100 words (analysis, tutorials, creative graphics, reviews, etc.)
Add hashtag: #PUBLIC Creative Contest#
Include screenshots of your Launchpool participation (e.g., staking record, reward
The Mitosis ecosystem is quietly making major moves.
From a $7M seed raise in May 2024 to $60M+ TVL by July 2025 that’s a 10x growth story fueled by smart liquidity design (think Vaults & ecosystem-owned liquidity).
But it’s not just about numbers. It’s about infrastructure that actually works:
➡️ Stork – Real-time on-chain data
➡️ Routescan – Cross-chain transparency
➡️ Fairblock – Encryption-first privacy (50% less front-running risk!)
➡️ Hyperlane – Seamless multi-chain messaging
Built for speed, scale, and serious utility and it's launching just as DeFi adoption jumps 40% . Timing? Impeccable.
Sure, Mindshare may be cooling off…
But when the tech, TVL, and traction all line up @MitosisOrg might just be that sleeper project ready to flip the script.
Gmito
#DeFi